The project
After construction work on a six-bedroom, five-bath home in Fullerton with three living rooms, the house was full of contractor supplies, boxes, floor protection and construction dust. The scope covered the whole property: every room, windows on both sides with their tracks, a chandelier hanging high above the floor, built-in closets and cabinets, pressure washing outside, and two detached garages.
How we phased it
- Top down — dust and residue cleared from the highest points first, starting with the chandelier, then fixtures, ledges and walls.
- Detail — windows inside and out with tracks, built-in closets, cabinets, five bathrooms and the kitchen.
- Floors and exterior — hardwood floors throughout, pressure washing outside, and both detached garages.
Challenges
The size and spread of the job were the challenge: six bedrooms, three living rooms, five baths, exterior work and two separate garages, all in one day. The chandelier hangs high and had to be cleaned before the floors underneath. We sent a crew of six so the whole property could be finished in seven hours.
Result
The house went from a job site to clean, move-in-ready rooms, with clear windows, dust-free built-ins and finished hardwood floors.