The project
A new 2,700 sq ft pizza restaurant at John Wayne Airport (SNA) in Irvine needed a full post-construction clean before opening: the kitchen line with conveyor ovens and the exhaust hood, prep and dish areas, hand sinks, storage, the walk-in cooler and freezer, and the dining and bar area. Construction and installation crews were still finishing work, so our team of six cleaned around them for two days, working together to keep each area moving.
How we phased it
- Ceilings and walls — construction dust cleaned off ceilings, vents, light fixtures and walls, top to bottom.
- Residue removal — paint, silicone, tape and adhesive taken off stainless steel, tile, glass and floors.
- Protective film — peeled from prep tables, sinks, plumbing fixtures and kitchen equipment.
- Refrigeration — commercial refrigerators washed inside and out, plus the walk-in cooler and freezer rooms.
- Hard-to-reach areas and final pass — high screens, ledges and gaps behind equipment from ladders, then floors throughout.
Challenges
Other trades were still installing equipment while we cleaned, so the crew worked around them and kept finished areas clean as new work came in. Much of the kitchen sits high or behind equipment, from the hood and ceiling vents to the gaps between appliances, and needed ladders and patience.
Result
The restaurant was handed over with clean ceilings and walls, film-free stainless steel, refrigeration clean inside and out, and a kitchen ready for opening day.